The UTIP initiative started with commissioning of a study of
the Hydropower Potential in the Zambezi between Cahora Bassa and Tete.
A development project has been identified with a first stage comprising
Mphanda Nkuwa dam and hydropower plant.
A further extention of Mphanda Nkuwa, coupled with Boroma dam for
downstream re-gulation is possible.
This is
called the Mphanda Nkuwa Hydropower Project.